Repairs: Progress Report

The plumbers fixed the pipes this this morning.  I had them watchdogged while I was at work.  Everything’s replaced and insulated, and everything works.  That’s the good news.  They’re going to attempt to schedule a city code inspector for tomorrow, but that’s ultimately up to the inspector if they can do it then.  And then it’ll probably be either Saturday or Monday when the hole can be filled in and the foundation restored in the garage, or perhaps tomorrow if the inspector comes early enough.  Either way, one big monkey off the back.  Two small monkeys remaining.

2 thoughts on “Repairs: Progress Report

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s