Repairs: Progress Report

The plumbers fixed the pipes this this morning.  I had them watchdogged while I was at work.  Everything’s replaced and insulated, and everything works.  That’s the good news.  They’re going to attempt to schedule a city code inspector for tomorrow, but that’s ultimately up to the inspector if they can do it then.  And then it’ll probably be either Saturday or Monday when the hole can be filled in and the foundation restored in the garage, or perhaps tomorrow if the inspector comes early enough.  Either way, one big monkey off the back.  Two small monkeys remaining.